Hello,
I will have to move my SEPM server 11.0.6 to a new Windows 2008 R2 server. I need also to upgrade SEPM 11.0.6 to 12.1. What should be the correct path to follow?
Here is what I think:
1. Install SPEM 11.0.6 on the new server as an additional server
2. reassign client to the new server
3. upgrade the new server to 12.1
I would prefer to install a fresh new 12.1 SEPM on the new server, but I think that will not be possible,
Thanks for your help.